Transportation

December 20, 2012

Traffic analyses were performed for the Rosemont Copper Project (Project) for two separate mine alternatives. The two alternatives included the...

July 9, 2012

This letter transmits two (2) copies of information that updates the encroachment permit application submitted to the Arizona Department of Transportation (ADOT) on December 23, 2011. This...

June 1, 2012

The Rosemont Primary Access Road Intersection Project Traffic ...

This preliminary Rosemont Copper Transportation Plan provides guidelines to help minimize impacts to areas, resources, and people adjoining, served by, or otherwise affected by roads on United...

The Rosemont Copper Transportation Plan provides guidelines to help minimize impacts to areas, resources, and people adjoining, served by, or otherwise affected by roads on United States Forest...

November 12, 2011

Change in "Level of Service" on State Route 83, year 20*.

January 12, 2010

This tech memo presents a traffic analysis for the Scholefield Tailings...

January 9, 2010

This tech memo presents a traffic analysis for the Partial Backfill Alternative.

This tech memo presents a traffic analysis for the Sycamore Tailings...

January 8, 2010

This tech memo presents a traffic analysis for the Barrel Only Alternative.

January 1, 2010

This Technical Memorandum presents the results of 3 additional scenarios analyzed as a supplement to the April 2009 Traffic Study Report and their impact...

December 15, 2009

This tech memo presents a traffic analysis for the Barrel and McCleary Alternative.

July 1, 2009

An assessment which analyzed the current roadway geometry and safety conditions was completed along AZ-83 between Interstate 10 and State Route 82.

June 25, 2009

This tech memo presents potential improvements for the current school bus stops along AZ-83. This memo also discusses the design criteria used for the improvements as well as the advantages and...

June 15, 2009

This tech memo presents two potential locations for wide load truck turnouts along SR 83. This memo also discusses the design criteria used for the turnouts as well as their advantages and...

June 4, 2009

This tech memo presents design alternatives for the proposed Primary Access Road associated with the Rosemont Copper Project.

This tech memo presents design alternatives for the proposed Primary Access Road associated with the Rosemont Copper Project.

This tech memo presents design alternatives for the proposed Primary Access Road associated with the Rosemont Copper Project.

May 11, 2009

This technical memo presents a summary of requirements for the Arizona state level designation of a Scenic Road. The requirements presented were taken from ADOT guidelines. This memo also presents...

January 1, 2009

A traffic analysis was completed to examine the existing traffic conditions along State Route 83 and to assess potential future traffic on AZ-83 asociated with Rosemont Copper Company's...

January 1, 2007

January 1, 2005

January 1, 2000