Post-Mining Regulatory (100-Yr) Hydrology and Average-Annual Runoff, Rosemont Copper Project
Document ID: 012419
2010
This tech memo provides a summary of Tetra Tech's findings related to predicted post-mining regulatory (100-year) hydrology and average-annual runoffi at the proposed Rosemont Copper Project.
Filed under:
