Rosemont Copper Project Review of Alternatives Considered but Dismissed
Document ID: 013421
2010
SRK evaluated each ACD for technical and practical feasibility on the basis of expert professional judgment and knowledge of the specific scientific and engineering aspects of the alternative. Additionally, each evaluation included a review of documents pertinent to the ACD and the current Mine Plan of Operationsi (MPO).
Filed under:
