References
Zeller, M.E. 2010a. Rosemont Baseline and Post-mining Conditions—Alternatives Sediment Delivery. Document No. 122/10-320871. Prepared for Rosemont Copper Company. Tucson, Arizona: Tetra Tech. April 9.
Zeller, M.E. 2010b. Rosemont Baseline and Post-mining Conditions—Sediment Delivery. Document No. 121/10-320828-5.3. Prepared for Rosemont Copper Company. Tucson, Arizona: Tetra Tech. April 9.
Zeller, M.E. 2011. Predicted Regulatory (100-Yr) Hydrology and Average-Annual Runoff Downstream of the Rosemont Copper Project. Tucson, Arizona: Tetra Tech. July 11.
