References

A · B · C · D · E · F · G · H · I · J · K · L · M · N · O · P · R · S · T · U · V · W · Y · Z

Zeller, M.E. 2010a. Rosemont Baseline and Post-mining Conditions—Alternatives Sediment Delivery. Document No. 122/10-320871. Prepared for Rosemont Copper Company. Tucson, Arizona: Tetra Tech. April 9.

Zeller, M.E. 2010b. Rosemont Baseline and Post-mining Conditions—Sediment Delivery. Document No. 121/10-320828-5.3. Prepared for Rosemont Copper Company. Tucson, Arizona: Tetra Tech. April 9.

Zeller, M.E. 2011. Predicted Regulatory (100-Yr) Hydrology and Average-Annual Runoff Downstream of the Rosemont Copper Project. Tucson, Arizona: Tetra Tech. July 11.