Document ID:
012399
Year Published:
2009
Summary:
This memo discusses the methodology behind the estimation of the Local and General Probable Maximum Precipitation (PMP) storm distributions for the Rosemont Copper Project.
Document:
Document Type:
Category:
Agencies and Consultants: