Document ID:
012407
Year Published:
2009
Summary:
This memo provides the potential volume of stormwater run-off that will be captured by the Heap Leach Pad and associated ponds as per the feasibility design configuration (including Phase 1 and 2 pads).
Document:
Document Type:
Category:
Agencies and Consultants: