Document ID:
012425
Year Published:
2010
Summary:
This tech memo provides a summary of Tetra Tech's findings realted to the infiltration of stormwater runoff for both baseline and post-mining conditions associated with the proposed Rosemont Copper Project.
Document:
Document Type:
Category:
Agencies and Consultants: