In addition to the tailings samples prepared in 2006-2008, six (6) new samples were prepared to better characterize the dry stack tailings associated with the proposed Rosemont Copper Project (Project). Tailings samples were generated from each of the five (5) major sulfide ore rock units and one (1) composite sample was generated from ore material representing production years 4 through 7.
Rosemont Tailings Geochemistry Sample Sources
Document ID:
013385
Year Published:
2010
Summary:
Document:
Document Type:
Category:
Agencies and Consultants:
Content Disclaimer
The information appearing on this Web site is for general informational purposes only. Every effort is made to provide accurate and useful information.
Read more