Baseline and Post Mine Hydrology and Sediment Delivery at USGS Gage for Barrel Alternative

Document ID: 
017358
Year Published: 
2012
Summary: 

This Technical Memorandum updates and supersedes previous summaries of Tetra Tech’s findings related to predicted baseline (pre) and post-mining regulatory (100-year) hydrology, average-annual runoff for baseline and post-mining conditions and average-annual sediment delivery for baseline and post-mining conditions at the proposed Rosemont Copper Project (Project Site). The project site is located in Sections 25 and 36 of T18S, R15E; Sections 19, 20, 21, 28, 29, 30, 31, and 32 of T18S, R16E; Section 1 of T19S, R15E; and Sections 5 and 6 of T19S, R16E, G&SRM, Pima County, Arizona.

Reference Information: 

Zeller, M. 2012. Baseline and Post Mine Hydrology and Sediment Delivery at USGS Gage for Barrel Alternative. Document No. 054/12-320929-5.3. Technical Memorandum. Prepared for Rosemont Copper Company. Tucson, AZ: Tetra Tech. July 11.

Document: 
Document Type: 
Agencies and Consultants: 

Content Disclaimer

The information appearing on this Web site is for general informational purposes only. Every effort is made to provide accurate and useful information.
Read more