Content Disclaimer

The information appearing on this Web site is for general informational purposes only. Every effort is made to provide accurate and useful information.
Read more

Documents Cited - Final EIS

Zeller, M. 2012. Baseline and Post Mine Hydrology and Sediment Delivery at USGS Gage for Barrel Alternative. Document No. 054/12-320929-5.3. Technical Memorandum. Prepared for Rosemont Copper Company. Tucson, AZ: Tetra Tech. July 11.

Zeller, M.E. 2010a. Technical Memorandum: Rosemont Baseline and Post-Mining Conditions—Alternatives Sediment Delivery. Document No. 122/10-320871. Prepared for Rosemont Copper Company. Tucson, AZ: Tetra Tech. April 9.

Zeller, M.E. 2010b. Technical Memorandum: Rosemont Baseline and Post-Mining Conditions—Sediment Delivery. Document No. 121/10-320828-5.3. Prepared for Rosemont Copper Company. Tucson, AZ: Tetra Tech. April 9.

Zeller, M.E. 2011a. Predicted Regulatory (100-Yr) Hydrology and Average-Annual Runoff Downstream of the Rosemont Copper Project. Tucson, Arizona: Tetra Tech. July 11.

Zeller, M.E. 2011b. Technical Memorandum: Response to PCRFCD Comments Regarding Hydrology. Document No. 140/11-320878-5.3. Prepared for Rosemont Copper Company. Tucson, AZ: Tetra Tech. August 18.

Zug, G.R. 1993. Herpetology: An Introductory Biology of Amphibians and Reptiles. San Diego, CA: Academic Press Inc.

Content Disclaimer

The information appearing on this Web site is for general informational purposes only. Every effort is made to provide accurate and useful information.
Read more